ASME Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist) (B30.18 - 2011)

ASME Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist) (B30.18 - 2011)

: ASME

: 9780791833469

: Book

$62.50

There is a newer edition of this document available.

 

B30.18 applies to the construction, installation, operation, inspection, and maintenance of hand-powered and power-driven overhead and gantry cranes that have a top or under running multiple girder bridge with a vertically guided carriage, with or without a top or under running trolley. The requirements included in this volume also apply to stacker cranes having the same fundamental characteristics, such as cantilever gantry and semi-gantry stacker cranes.

 

  • Publisher: ASME
  • Publish Date: 2011
  • Pages: 36
  • Language: English
  • ISBN: 9780791833469

    Find a RIGGING Class

    Looking for the classroom experience? Brown offers a direct way to book any NCCER class around the country through us. We will locate the class closest to you. Click the link to get started.

    See More titles in all

    See More titles in ASME

    See More titles in Bookstore

    See More titles in codes and standards

    See More titles in crane